p. 147-168
Project Scheduling Maximizing the Fuzzy Net Present Value Influenced by the Decision Maker Attitude
Irem Ucal Sari and Dorota Kuchta
Abstract
Full Text (IP)
p. 169-187
An Improved Electromagnetism-like Method for Feature Selection
Aleksandar Kartelj
Abstract
Full Text (IP)
p. 189-213
Variable Weighted Maximal Relevance Minimal Redundancy Criterion for Feature Selection Using Normalized Mutual Information
Sanghamitra Bandyopadhyay, Tapas Bhadra and Ujjwal Maulik
Abstract
Full Text (IP)
p. 215-235
Forecasting Passenger Volumes in Transit Systems Using Support Vector Machines: The Case of Istanbul
Basar Oztaysi, Seda Yanik and Cengiz Kahraman
Abstract
Full Text (IP)
Supplement (IP)
p. 237-267
Applications of Falling Fuzzy h-bi-(h-quasi-)ideals to Hemirings Based on Probability Spaces
Bin Yu and Jianming Zhan
Abstract
Full Text (IP)
p. 269-289
A Fuzzy Mixed Integer Linear Programming Model for a Reverse Logistics System with a Real Case Application
Betül Özkan, Hüseyin Bas Ligil, Ishan Kaya and Vildan Özkir
Abstract
Full Text (IP)
p. 291-321
Predicting the Success of Projects Using Evolutionary Hybrid Fuzzy Neural Network Method in Early Stages
Mehdi Fasanghari, Seyed Hossein Iranmanesh and Mohsed Sadegh Amalnick
Abstract
Full Text (IP)
p. 323-338
Triangular Intutionistic Fuzzy Geometric Bonferroni Mean and Its Application in Human Resources Outsource Vendors Selection
Dejian Yu
Abstract
Full Text (IP)